LumoWatt

Generator Installers in Green Bay, WI

Compare local installers

Brand
Fuel type
Status

Showing 3 of 3 installers

Zepnick Electric LLC is a licensed WI electrical contractor based in Green Bay, owned by Robert Zepnick, offering generator installation alongside electrical replacement and light fixture installation.

Fuel types
Natural gas, Propane
License
License checked
Service area
Green Bay and the surrounding Fox Valley area

Brice Electric LLC is a licensed WI electrical contractor offering both Kohler and Generac generator models alongside new home wiring, renovations, and lighting for the greater Green Bay area.

Fuel types
Natural gas, Propane
License
License checked
Service area
Green Bay, De Pere, and the Fox Valley area

Brey Electric LLC is a licensed WI electrical contractor offering whole-home standby generator installation alongside panel upgrades, EV chargers, and electrical repair for the Green Bay, Oshkosh, and Kaukauna area.

Years in business
2
Fuel types
Natural gas, Propane
License
License checked
Service area
Green Bay, Neenah, and the Fox Valley area

Average cost in Green Bay

Whole-home standby generator installation in Green Bay typically costs $6,500–$14,000 all-in. See our full cost breakdown guide for what drives the price up or down.

Permit & code requirements in Green Bay

City of Green Bay Building Inspection Division issues electrical permits within city limits.

See the full Wisconsin state permit overview.

Frequently asked questions

Do I need a permit to install a generator in Green Bay?
City of Green Bay Building Inspection Division issues electrical permits within city limits.
How much does generator installation cost in Green Bay?
Most whole-home standby installations in Green Bay run $6,500–$14,000 all-in, including the unit, labor, and permit fees. Get quotes from at least 2–3 license-checked local installers below for an accurate number for your home.
How long does installation take in Green Bay?
Most installations take 1–2 days once permits are approved; permit approval timelines vary by city and typically add 1–4 weeks.

Nearby cities