Generator Installers in Detroit, MI

Compare local installers

Brand
Fuel type
Status

Showing 3 of 3 installers

Grizzly Electric is a Metro Detroit electrical contractor and authorized Generac installer providing standby-generator installation for homes and businesses.

Fuel types
Natural gas, Propane
License
License checked
Service area
Detroit, Oakland County, Wayne County, Macomb County, and surrounding communities

Seaglund Electric provides Metro Detroit homeowners and businesses with Generac standby-generator installation, transfer-switch integration, and electrical upgrades.

Fuel types
Natural gas, Propane
License
License checked
Service area
Detroit, Rochester Hills, Oakland County, and the surrounding metro area

Metro Electric is a Southeast Michigan electrical contractor offering Generac whole-home standby-generator sales, installation, service, and residential electrical work.

Fuel types
Natural gas, Propane
License
License checked
Service area
Detroit, Macomb and Oakland counties, Romeo, Troy, Royal Oak, and nearby communities

Average cost in Detroit

Whole-home standby generator installation in Detroit typically costs $7,000–$15,300 all-in. See our full cost breakdown guide for what drives the price up or down.

Permit & code requirements in Detroit

Detroit requires a city-licensed electrician and an electrical permit for permanently installed generators, transfer switches, and associated wiring.

See the full Michigan state permit overview.

Frequently asked questions

Do I need a permit to install a generator in Detroit?
Detroit requires a city-licensed electrician and an electrical permit for permanently installed generators, transfer switches, and associated wiring.
How much does generator installation cost in Detroit?
Most whole-home standby installations in Detroit run $7,000–$15,300 all-in, including the unit, labor, and permit fees. Get quotes from at least 2–3 license-checked local installers below for an accurate number for your home.
How long does installation take in Detroit?
Most installations take 1–2 days once permits are approved; permit approval timelines vary by city and typically add 1–4 weeks.